SCC Passes 2013 Energy-saving Assessment in Nanshan District
03 12,2014 发布者:admin 63

 On March 5, the "Ten Thousand Enterprise Energy-saving Assessment in the 12th Five-Year Plan” of Nanshan District was conducted in Longgang manufacturing base, and SCC passed the assessment with 97 points.


 First, the group of experts listened to the energy-saving work report of SCC in 2013, checked institutional documents related to energy-saving in SCC, and visited some energy-saving projects implemented by the Company in 2013. After evaluation, the expert group concluded that in 2013, SCC achieved 2, 593.67 tons of energy-saving standard coal, and with excellent energy-saving performance, accomplished all energy-saving tasks of the “Twelfth Five-Year Plan” two years ahead of schedule, and therefore received a high score of 97 points. At the same time, the expert group suggested that the Company should continue with the work in the construction of energy management system, the management of contract energy and the improvement of motor energy consumption to achieve continuous optimization of energy consumption levels.


  Since the beginning of 2011, SCC has been working on energy-saving work through continuous energy-saving projects and optimization of on-site management and other ways, and has achieved good result of continuous reduction of energy consumption, and therefore obtained the unanimous approval of the expert group.